No. Sebutharga

 

Bil.

221

Tarikh Mohon

05/02/2020

Tarikh Siap

06/02/2020

Nama Kontraktor

Syarikat Murni

Lokasi / Bangunan

fkab lama

Nama Penolong Jurutera

Noraini

Butiran kerosakan

tangki overfloor. float valve tangki rosak

Anggaran Kos (RM)

 

Kos Sebenar (RM)

1,260.00

No. Invois

UKM/SM/PB/INV110

Attachments

Created at 05/02/2020 11:41 by K015402
Last modified at 06/03/2020 9:38 by K021712